Aiming to stop wasteful use of energy and bridge the strength need-supply gap, the Government of India enacted the Energy Conservation Act(EC Act) and established Bureau of Energy Efficiency under Ministry of strength. One of the important provisions of the EC Act relates to the enforcement of Energy Conservation Building Codes for efficient use of energy and its conservation in the buildings or building complexes.

As defined in the EC Act, Energy Conservation Building Codes(E.C.B.C) method the norms and standards of energy consumption expressed in terms of per square metre of the area where the energy is used and includes the location of the building.

The EC Act mandates the E.C.B.C for buildings with a connected load of 500 KW or contract need of 600×1000 VA and above and are intended to be used for the commercial purposes and are constructed after the rules relating to E.C.B.C have been notified by the States Governments under section 15 (a).

Features of E.C.B.C

The E.C.B.C will set minimum energy efficiency standards for design and construction of a non-residential building. Energy performance standards for the following building systems are included in the E.C.B.C

• Building Envelope.

• Lighting.

• Heating Ventilation and Air Conditioning.

• Service Water Heating.

• Electric strength and dispensing.

However, the general requirements of the Code with respect to the building envelope are the same for new buildings in addition as for extensions and modifications.

All over the world, E.C.B.Cs have a proven track record of considerably reducing energy use in buildings in a cost effective manner. The E.C.B.C assistance both individual building owners and the people and government at large. assistance to character owners include reduced energy costs and improved comfort (both thermal and visual). The benefits to society include the following:

• Reduced capital investments in energy supply infrastructure.

• Reduced environmental impacts.

• Improved electricity reliability.

• More efficient use of resource (It is cheaper to save energy than it is to build new strength plants).

It is estimated that buildings that are E.C.B.C compliant have a possible of savings to the tune of about 30%-35%.

Road Map to make E.C.B.C Mandatory

Given the fact that the capacity in the country required to effectively implement this code is inadequate, the implementation of the codes will be on voluntary basis initially. Incentives to promote its use in the voluntary phase will be provided. Only when there is sufficient availability of both technical skill and complaint material, will the codes be made mandatory. The Government will set afloat an effective awareness campaign to promote E.C.B.C all over the country.

Compliance Requirements

All the buildings or building complexes with a connected load of 500 kW or greater or a contract need of 600×1000 VA or greater* have to comply with the Code. Buildings with 1,000 m2 or more of conditioned area are likely to fall under the above load conditions. The following sections which deal with mandatory and prescriptive requirements of new and existing buildings are related to this stated threshold area. It is important to mention here that these mandatory and prescriptive requirements are applicable only where the building has a connected load of 500 kW or more or contract need of 600×1000 VA or more..

The Code is presently under voluntary adoption in the country.

This Code would become mandatory as and when it is notified by the Central and State government in the official Gazette under clause (p) of §14 or clause (a) of §15 of the Energy Conservation Act 2001 (52 of 2001)

As per the Code:

strength transformers of the proper ratings and design must be chosen to satisfy the minimum permissible efficiency at 50% and complete load rating. In addition, the transformer must be chosen such that it minimizes the total of its initial cost in addition to the present value of the cost of its total lost energy while serving its estimated loads during its respective life span.

E.C.B.C lists various transformer sizes of dry-kind and oil-filled transformers and their associated losses at 50% and complete load rating.

CALCULATIONS DEPICTING THE PAYBACK PERIOD:

Return On Investment (ROI) for Transformer Of 1500×1000 VA with 100% Loading.

DESCRIPTION——————————————NORMAL/E.C.B.C

Total Losses(In KW)———————————–19.11/14.143

Difference of Losses(In KW)—————————4.967

Hours in a Day——————————————-24

No.of Days————————————————365

Rate Per Unit———————————————7.5

Savings Per Year(In Rs.)——————————-326331.9

Cost of Equipment(In Rs.)—————————–865000/1350000

Difference in Prices————————————–485000

Return on Investment———————————–1.49

Return on Investment (In Months)——————-18 Months Approx.

From above it can be concluded that we can approx. Rs. 3.25Lac on our electricity bill and additional cost price paid by us shall be returnable after 18 Months, this is will be a huge saving on the electricity bills.